Terminal of Dar Airport to Complete By End This Year

By Alfred Zacharia

The construction of Terminal Three at the Julius Nyerere International Airport (JNIA) has been completed by 68 per cent, the Minister for Works, Transport and Communications, Prof Makame Mbarawa has said.

This brings hope that the country will soon more than double its passenger capacity at its main airport.

“The construction is progressing well. We are still expecting the job to complete before the end of this year,” Prof Mbarawa said during his tour of the site early today (Monday).

Construction of outside facilities has completed. Currently, experts are installing some vital materials, including cargo handling machines inside the building.

Upon completion, terminals 1, 2 and 3 of the airport will handle a total of 9 million passengers annually.

Tanzania

Banning Pastic Material in Tanzania a Possibility

Tanzania is still weighing on impact of the envisaged ban on the use polythene materials before effecting it. Read more »

Continued: 

Terminal of Dar Airport to Complete By End This Year

Метки: , , , , , , , ,

Short URL: http://www.eabizinfo.com/?p=124561

Posted by on Feb 12 2018. Filed under Tanzania. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

Subscribe To Our Mailing List

* indicates required
/ ( mm / dd )


Featured Links

    Search Archive

    Search by Date
    Search by Category
    Search with Google
    Log in | Designed by Gabfire themes